Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Carinthia ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
The process of transferring a vessel to water, but not necessarily her completion.
02/12/1926 ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Unique identifier for a given ship, it is assigned by a builder.
586 ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Broad categories and subdivisions of vessels related to their purpose or function.
Passenger ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Type of fuel used onboard a vessel.
Steam - Oil ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Is the steamer assisted by sail?
No ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Is machinery fitted at the aft of the vessel?
No ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Brw ( Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925 )
Liv ( Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
The listed port to which a given vessel belongs.
Barrow-in-Furness ( Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925 )
Liverpool ( First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1 Shelter deck with freeboard; Lloyd's a&b P; (???) (???) (also fire damage); +LMC 8.25; CL FD fitted for oil fuel 8.25; TP above 150˚ F ( First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925 )
100A1 Shelter dk with freeboard (class contemplated) ( Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925 )
˚ F ( Report on Machinery for Carinthia, 10 August 1925 1925 )
Elec Light ( Report on Electric Fittings for Carinthia, 19 October 1925 1925 )
+Lloyd's RMC 1.39 ( Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939 )
+100A1 Shelter Deck with freeboard 1.39; ss Liv no3 1.38; TS 1.39 CL fitted for oil fuel 8.25; FP above 150˚ F; in red; +LMC 1.37; +Lloyd's RMC 7.39; BS 1.39 ( Report of Total Loss and Casualty for Carinthia, October 1939 1939 )
+100A1; Dk with freeboard 1.39; ss Liv no3 1.38; fitted for oil fuel 8.25; FP above 150˚ F; +LMC 1.37; +Lloyd's RMC 1.39; BS 1.39; TS(CL) 1.39 ( Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
20277 ( First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
20000 ( Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925 )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
12087 ( First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925 )
12088 ( Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939 )
11971 ( Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Ernest Granville Diggle ( Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925 )
J F B Barrett ( Report of Total Loss and Casualty for Carinthia, October 1939 1939 )
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
73.8 ( Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925 )
The name of the port/place of destination given.
New York ( Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Carinthia torpedoed and sunk by German U-boat. Guns were manned when the U-boat attempted to surface, forcing her to submerge and successfully fighting her off until they could be joined by two warships and a rescue tug. Crew transferred to warships and a skeleton staff remain for 32 hours. Later forced to evacuate and cut the tow line before she sank ( Report of Total Loss and Casualty for Carinthia, October 1939 1939 )
Recorded date for the vessel’s loss or disposal.
31/05/1940 ( Report of Total Loss and Casualty for Carinthia, October 1939 1939 )
The year in which a vessel’s construction is completed.
1925 ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Vickers Ltd ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
The port or place in which the vessel’s construction took place, at the time of writing.
Barrow-in-Furness ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Location where a vessel’s survey was undertaken.
Barrow-in-Furness ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925 )
London ( Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925 )
Barrow-in-Furness; Barrow ( Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925 )
Birkenhead; Liverpool ( Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925 )
Liverpool ( Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
A vessel’s means of propulsion.
Steam ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Does the vessel possess an auxiliary power source?
No ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Is electric lighting fitted to the vessel?
No ( Plan of Fly to Double Ended Boiler Shewing (Showing) Position of Rivets for Carinthia, 18 March 1920 1920, Plan of Double Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Single Ended Boilers for Carinthia, 29 March 1920 1920, Plan of Arrangement of Main Gearing for Carinthia, 31 May 1920 1920, Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Copy of letter from the Assistant to the Secretary of Lloyd's Register London to the Surveyors at Barrow, regarding changing the machinery record for Carinthia in the Register Book to "4 Steam Turbines", 1 October 1925 1925, Copy of letter from the Secretary of Lloyd's Register London to the Surveyors at Barrow regarding the machinery of Carinthia and informing that the H P and I P turbines are counted as two, not one, 29 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Remarks of the Chief Ship Surveyor to the Classing Committee for Carinthia, 19 August 1925 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Plan of Midship Section for Carinthia, 12 August 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Yes ( Report on Electric Fittings for Carinthia, 19 October 1925 1925 )
Name of surveyor.
William Cowie ( Letter from William Cowie, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London regarding the machinery for the vessel Carinthia and informing that she is not fitted with an I P turbine, 30 September 1925 1925, Memo between Lloyd's Register Barrow-in-Furness Office to the Secretary of Lloyd's Register London confirming turbine information for the vessel Carinthia, 28 September 1925 1925, Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925 )
Kenneth Inglis ( Letter from Kenneth Inglis, Surveyor at Barrow-in-Furness, to the Secretary of Lloyd's Register London informing that all necessary repairs to the vessel Carinthia have been carried out and that screw shafts have been fitted with continuous liners, 22 Aug 1925, Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925 )
George Laird Lyle ( Report of Survey for Repairs for Carinthia, 7 August 1925 1925 )
Benjamin George Oxford ( Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925 )
Charles William Reed; Clifford Raymond Maplestone ( Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939 )
William Harrison Waggott ( Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom ( Copy of Freeboard Verification Form for Steamers for Carinthia, 30 June 1925 1925, First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925, Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
The individual and/or organisation listed
Cunard Steamship Co Ltd ( First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925, Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925 )
Cunard White Star Line Ltd ( Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Total Loss and Casualty for Carinthia, October 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
Recorded information related to a vessel’s movements.
Barrow-in-Furness ( First Entry Report for Steel Steamer or Motorship Carinthia, 18 August 1925 1925, Report on survey of damage to Carinthia due to an outbreak of fire, with fees and recommendations noted, 4 May 1925 1925, Report on Machinery for Carinthia, 10 August 1925 1925, Report on Electric Fittings for Carinthia, 19 October 1925 1925 )
Birkenhead ( Report of Survey for Repairs for Carinthia, 7 August 1925 1925, Report of Survey for Repairs of Engines and Boilers for Carinthia, 7 August 1925 1925 )
Walney Island; Buccleuch Dock, Barrow-in-Furness ( Report on survey of damage to Carinthia with fees noted, 10 March 1925 1925 )
Liverpool ( Report of Survey on Refrigerating Machinery and Appliances for Carinthia, 12 January 1939 1939, Report of Survey for Repairs of Engines and Boilers for Carinthia, July 1939 1939 )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
K.S.W.B. ( Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925 )
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
600.7 ( Form for Vessels of 100 Tons and Upwards for Carinthia, 21 July 1925 1925 )
Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.
The official record pronounced by the Committee
Sunk (war loss) ( Report of Total Loss and Casualty for Carinthia, October 1939 1939 )
Two crew members and two ratings lost, rest of crew safely rescued ( Report of Total Loss and Casualty for Carinthia, October 1939 1939 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.