Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Liverpool ( Half Midship Section Plan for Liverpool, 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Reciprocating Steam Engine Surveys for Liverpool, Undated no date )
Esso Liverpool ( Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
John D Archbold ( Note for Esso Liverpool, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
__/__/0000 ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
261 ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
Location where a vessel’s survey was undertaken.
Newport News Va ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920 )
London ( Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961 )
Newcastle on Tyne ( Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date )
Wallsend on Tyne; Newcastle ( Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report on Boilers for Esso Liverpool, Undated no date )
Wallsend; Newcastle ( Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950 )
Amsterdam ( Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952 )
Genoa ( Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960 )
La Spezia ( Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953 )
La Spezia; Genoa ( Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954 )
Genova ( Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959 )
London; Genoa ( Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960 )
Newcastle ( Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date )
Newcastle upon Tyne; Newcastle ( Report of Surveys for Freeboard for Esso Liverpool, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
Is electric lighting fitted to the vessel?
No ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk ( Half Midship Section Plan for Liverpool, 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950 )
Oil Carrier ( Profile & Decks Plan for Esso Liverpool, Undated no date )
The individual and/or organisation listed
Anglo American Oil Co Ltd ( Certificate of Class for Esso Liverpool, 6th October 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report on Boilers for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date )
Steamship Enterprises of Panama Inc ( Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958 )
Steamship Interprises of Panama Inc ( Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958 )
Kaye Son & Co Ltd ( Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
14539 ( Certificate of Class for Esso Liverpool, 6th October 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Boilers for Esso Liverpool, Undated no date )
14540 ( Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, Undated no date )
14050 ( Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc ( Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report on Boilers for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date )
Ams ( Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952 )
Gen ( Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Reginald A Carder ( Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950 )
Esso Transportation Co ( Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950 )
Location of construction for a vessel’s engines.
Newport News U S A ( Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950 )
Newport News USA ( Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Boilers for Esso Liverpool, Undated no date )
Newport News ( Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958 )
The year in which a vessel’s construction is completed.
1921 ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Newport News Shipbuilding & Dry Dock Co ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Newport News Va ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
A vessel’s means of propulsion.
undefined ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Memo for Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Note for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
Steam ( Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date )
Is the steamer assisted by sail?
No ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Half Midship Section Plan for Liverpool, 1920 1920, Rudder Plan for Esso Liverpool, 23rd September 1920 1920, Plan of Stern Frame for Esso Liverpool, 23rd September 1920 1920, Certificate of Class for Esso Liverpool, 6th October 1950 1950, Certificate for Machinery for Esso Liverpool, 6th October 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 5th September 1950 1950, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Newcastle on Tyne, regarding Esso Liverpool, 23rd August 1950 1950, Letter from G R Edgar, per The Surveyors, to The Secretary, London, regarding Esso Liverpool, 18th August 1950 1950, Report on Masts, Spars, & Rigging for Esso Liverpool, 1st May 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 18th July 1950 1950, Extract from Freeboard Verification of Marking Form for Esso Liverpool, 27th June 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Esso Liverpool, 29th September 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950, Memo about the Freeboard Report for Esso Liverpool, 16th May 1950 1950, Draft of memo regarding freeboard report for Esso Liverpool, 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard for Esso Liverpool, 16th May 1950 1950, Report of Surveys for Freeboard-Steam Ships for Esso Liverpool, 22nd May 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Copy of Letter from pro Secretary, to The Surveyors, Genoa, regarding Liverpool, 7th October 1953 1953, Letter from J A Mavor, Principal Surveyor for Italy, to The Secretary, London, regarding Liverpool, 2nd October 1953 1953, Plan in Italian language of Auxiliary Rudders to add to the Main Rudder for Liverpool, 9th September 1953 1953, Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Letter from The Surveyors, to The Secretary, London, regarding Liverpool, 27th March 1954 1954, Extract from Genoa Classing Letter dated 19th March 1954, Liverpool 1954, Remarks of the Chief Ship Surveyor, regarding class of Liverpool, 18th March 1954 1954, Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 12th February 1954 1954, Copy of Certificate of Survey of Damage & Repairs for Liverpool, 25th January 1954 1954, Copy of Certificate of Survey of Boiler & Machinery for Liverpool, 25th January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines & Boilers of Liverpool, 17th March 1954 1954, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Engines &/ or Boilers Partly Held of Liverpool, 27th September 1956 1956, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Copy of Certificate of Survey of Repairs for Liverpool, 23rd December 1958 1958, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Letter from R Elliot, for The Surveyors, to The Secretary, London, regarding Liverpool, 6th December 1958 1958, Memo for Liverpool, 28th November 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Liverpool, 14th November 1958 1958, Copy of Certificate of Survey of Boilers & Machinery for Liverpool, 29th July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Copy of Telex from the Committee, London, to the Genoa Surveyors regarding Liverpool, 23rd November 1959 1959, Memo for Liverpool, 23rd November 1959 1959, Telex from the Genova Surveyors to the Committee, London, regarding Liverpool, 23rd November 1959 1959, Letter from J D Sutherst, for The Surveyors, to The Secretary, London, regarding Liverpool, 3rd February 1959 1959, Extract from Genoa Classing Letter dated 23rd January 1959, Liverpool 1959, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Liverpool, 15th January 1959 1959, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 21st December 1960 1960, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 1st February 1960 1960, Letter from E Little, for The Surveyors, to The Secretary, London, regarding Liverpool, 21st January 1960 1960, Question & Answer Memo between London & Genoa Offices, regarding Liverpool Still being laid up, 18th January 1960 1960, Memo for Liverpool, 1st December 1961 1961, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Genoa, regarding Liverpool, 13th December 1961 1961, Profile & Decks Plan for Esso Liverpool, Undated no date, Report on Boilers for Esso Liverpool, Undated no date, Note for Esso Liverpool, Undated no date, Reciprocating Steam Engine Surveys for Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date, Graph for Esso Liverpool, Undated no date )
The port in which a vessel is registered or permanently based.
London ( Certificate of Class for Esso Liverpool, 6th October 1950 1950, Steel Steamer Report for Liverpool, 5th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Annual Load Line Survey for Esso Liverpool, 3rd July 1952 1952, Report of Surveys for Freeboard - Conditions of Assignment for Esso Liverpool, Undated no date, Report of Surveys for Freeboard for Esso Liverpool, Undated no date )
Panama ( Report C.11 continued, Alterations to Conditions of Assignment of Loadlines for Liverpool, 3rd November 1953 1953, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Carrying Petroleum in Bulk; Fitted for oil Fuel Flash Point above 150 F ( Certificate of Class for Esso Liverpool, 6th October 1950 1950 )
+100A1; Carrying Petroleum in Bulk; Fitted for Oil Fuel FP Above 150 F; Classed 7,50 6,50; Nwc S S Nwc 7,50 (Dr); Lloyd\'s A & CP; LMC 6,50 S (Psn) 6,50; 3 SB 200 lb FD ( Steel Steamer Report for Liverpool, 5th July 1950 1950 )
See Minute on FE Rpt ( Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report on Boilers for Esso Liverpool, Undated no date )
LMC 6,50; S (P Sn) 6,50 ( Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950 )
Contemplated ( Report of Surveys for Freeboard for Esso Liverpool, 22nd May 1950 1950 )
12,55 Spz; (Delete Endorsement); SS Spz 12,55; LMC 12,53 Without Spl Condition (With Endorsement) Prt S 11,55; Stbd S 11,53 ( Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954 )
LMC 12,53 Without Spl Condition (With Endorsment) Port S 11,53; Stbd S 11,53 CL ( Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954 )
Overdue SS 12,57 Incomplete ( Report of Ship Surveys & Repairs for Liverpool, 23rd December 1958 1958 )
Deferred for Comp ES & MBS & for Stbd TS ( Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
GGFL ( Steel Steamer Report for Liverpool, 5th July 1950 1950, Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950 )
The listed port to which a given vessel belongs.
London ( Report of Survey for Repairs, &c for Esso Liverpool, 24th July 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report on Electrical Equipment for Esso Liverpool, 1st July 1950 1950, Report on Boilers for Esso Liverpool, Undated no date )
Panama ( Report of Survey for Repairs, &c for Liverpool, 2nd January 1954 1954 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950 )
Twin Screw Steam Reciprocating Triple Expansion ( Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950 )
T ( Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958 )
Date in which construction of a vessel’s engines were completed.
1921 ( Form for Vessels of 100 Tons & Upwards for Esso Liverpool, 23rd June 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Esso Liverpool, 29th June 1950 1950, Report on Steam Reciprocating Engine Machinery for Esso Liverpool, 29th June 1950 1950, Report of Survey for Repairs, &c, of Engines & Boilers for Liverpool, 2nd January 1954 1954, Report of Periodical Surveys & Repairs of Machinery for Liverpool, 29th July 1958 1958, Report on Boilers for Esso Liverpool, Undated no date )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.