Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
14/08/1933
The year in which a vessel’s construction is completed.
1922
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Wood, Skinner & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
C11 Surveys for Freeboard
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Gothenburg
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Burnt & Sunk
Vessel’s area of loss or disposal/last known recorded location.
Anholt Lighthouse
Physical extent of a record.
1
Name of ship as recorded on the record
Bifrost
The process of transferring a vessel to water, but not necessarily her completion.
06/11/1922
Unique identifier for a given ship, it is assigned by a builder.
225
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Got
The port in which a vessel is registered or permanently based.
Gothenburg
Name of the individual/entity/organisation responsible for authoring the record
E G Hjernqvist
Location where a vessel’s survey was undertaken.
Gothenburg
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Caught Fire & Sank
Recorded date for the vessel’s loss or disposal.
22/01/1956
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.